Furnace Pulse™

YOUR LINING IS
FAILING EARLY.
HERE'S WHY.

Every unplanned lining failure has a root cause — charge mix, sintering practice, material inconsistency, or operating temperature. Most plants never find it because they never look. This 2-minute diagnostic changes that.

RUN FURNACE PULSE →
₹2.5L+
Cost per unplanned
lining failure
15 vs 30
Heats per campaign
worst vs best practice
75%
Plants don't track
lining performance
₹5.7L
Annual savings from
right grade selection
The Problem

MOST PLANTS DON'T KNOW
WHY THEIR LININGS FAIL

The lining fails. You reline. It fails again. Nobody asks why — because nobody has the data. Here are three things your current supplier has never told you:

Wrong Grade for Your Furnace
A 10MT furnace running at 1620°C on DRI-heavy charge needs a different grade than a 20MT furnace on clean scrap at 1550°C. Most suppliers sell one product to everyone.
No Sintering Guidance
Your supplier delivers bags. Do they tell you the exact heating rate, first-charge protocol, and temperature hold times for their specific material? If not, you're sintering blind.
No Campaign Benchmark
What should your lining life be — given your furnace size, temperature, and charge mix? Without a benchmark, you can't tell if 15 heats is good or if 25 is achievable.
What You Receive

A PERSONALISED LINING
RECOMMENDATION IN 12 HOURS

Share your furnace details. Our technical team analyses your operating profile — capacity, temperature, charge mix, current challenges — and sends you a tailored recommendation. Free. No obligation.

01
Grade Match
The right PSM grade — Basemix, Boric, or Boron bonded — matched specifically to your furnace capacity, temperature profile, and charge mix chemistry.
02
Campaign Benchmark
What campaign life you should expect given your operating conditions — and what you're likely leaving on the table with your current material.
03
Free Trial Plan
A structured trial proposal — test the material, compare the numbers, then decide. Full technical support included during trial. Zero risk.
Takes Less Than 2 Minutes

RUN YOUR FURNACE PULSE

Answer five quick sections about your furnace. We'll do the analysis and send your personalised recommendation to your inbox.

Furnace
Operations
Charge Mix
Challenges
Contact
Furnace Configuration

Basic setup details help us match the right grade and application method for your specific furnace.

Operational Details

How your furnace runs tells us which grade will perform best and what campaign life to target.

Charge Mix Composition

Your charge mix directly impacts lining wear rate. A DRI-heavy charge creates different slag chemistry than clean scrap — and requires a different ramming mass grade.

DRI / Iron Ore Pellets
40%
Scrap
60%
100% Scrap50 / 50100% DRI / Pellets
Select DRI / Pellets Type:
What's Going Wrong?

Select every issue you're facing. This focuses our recommendation on what matters most to your plant.

Inconsistent lining life
Batch-to-batch variation
Frequent furnace downtime
High ramming mass cost
Supplier reliability issues
Cracking / sintering problems
No traceability from supplier
Timely delivery issues
Looking to reduce costs
Poor after-sales support
Where Do We Send Your Report?

Your details are used only to deliver your lining recommendation. Nothing else. No spam. No calls unless you ask.

WhatsApp
Email
Phone call
Site visit

What happens next: our technical team reviews your furnace profile and emails a personalised lining recommendation within 12 hours — followed by a call only if you ask for one. No spam, no obligation.

DIAGNOSTIC RECEIVED

Our technical team will analyse your furnace profile and email your personalised lining recommendation within 12 hours. Urgent? WhatsApp us at +91 99429 95507.

info@psmgroup.co.in

Jharkhand, India
Assess First. Supply Second.
3 Grades — Basemix · Boric · Boron
Response Within 12 Hours
info@psmgroup.co.in